Professional Bitcoin mining requires a strategic approach and robust infrastructure to remain competitive in 2026. With network difficulty constantly rising and margins shrinking, setting up an efficient mining farm is becoming a major technical and economic challenge. This guide details all the essential aspects of creating a profitable and sustainable professional mining operation.

Electrical infrastructure: the foundation of your mining farm

Calculating power requirements

The first step is to assess your power requirements. A modern ASIC such as the Antminer S21 consumes 3,520W, or approximately 84 kWh per day. For a farm of 100 machines, you need to allow for:

  • Total power : 352 kW minimum
  • Safety margin : +15%, i.e. 405 kW
  • Monthly consumption : ~252,000 kWh

The cost of electricity remains the key factor. In 2026, aim for a tariff of less than €0.08/kWh to remain profitable with Bitcoin at €59,000.

Professional electrical installation

Your infrastructure must comply with industry standards:

Transformer and distribution:

  • MV/LV transformer suited to your power requirements
  • Low-voltage main distribution board (LVDB) with residual current protection
  • Distribution by sector to facilitate maintenance

Cabling and protection:

  • Cables sized in accordance with standard NF C 15-100
  • 30mA residual current circuit breakers per circuit
  • Type 1+2 surge arrester at the head of the installation
  • Accessible emergency shut-off system

Electrical redundancy with two independent power supplies can prevent significant losses in the event of mains power failures.

Cooling system suited to the French climate

Air cooling: a cost-effective solution

Cooling accounts for 15 to 20 per cent of total energy consumption. In France, air cooling remains the optimal solution for 8 out of 12 months:

Recommended configuration:

  • 380V industrial fans with variable frequency drives
  • Air circulation via hot/cold aisles
  • Target temperature: 25–30°C at the air inlet
  • Air flow rate: minimum 2,000 m³/h per ASIC

Seasonal optimisation:

  • Winter: natural cooling (free cooling)
  • Summer: support via misting or air conditioning

Advanced solutions for summer

For hot periods, there are several options available to you:

Solution Installation cost Energy consumption Efficiency
Industrial air conditioning €50,000 +25% Excellent
Evaporative cooling €25,000 +10% Good
Liquid cooling €100,000 +5% Optimal

Monitoring your Bitcoin mining operation allows you to automatically adjust the cooling system according to conditions.

Design and layout of the space

Calculation of required floor space

For an efficient farm, allow for:

  • Mining space : 0.5 m² per ASIC (including circulation space)
  • Technical area : 20 per cent of the mining space
  • Office/monitoring : minimum 15 m²
  • Spare parts storage : 10 m² for 100 machines

Example for 100 ASICs:

  • Total space: 75 m²
  • Ceiling height: minimum 3.5 m
  • Delivery access: gate at least 3 m wide

Optimised layout

The layout of the space has a direct impact on efficiency:

Aisle-based layout:

  • 1.2m aisles between the racks
  • Shelf height: maximum 2 metres
  • 4 ASICs per shelf to facilitate maintenance
  • Physical separation of hot and cold air flows

Dedicated areas:

  • Quarantine area for faulty machines
  • Fully equipped repair workshop
  • Technical room for electrical and network systems

Equipment selection and configuration

Selection of ASICs in 2026

The selection process should prioritise energy efficiency:

Recommended ASICs:

  • Antminer S21 Pro : 15 J/TH, 234 TH/s
  • Whatsminer M60S : 16 J/TH, 172 TH/s
  • Avalon A1566 : 18 J/TH, 185 TH/s

With Bitcoin at €59,000 and a yield of 0.00000054 BTC/TH/day, an ASIC at 15 J/TH generates approximately €7.60/day in gross revenue.

Robust network infrastructure

Internet connectivity:

  • Dedicated fibre-optic connection, minimum 100 Mbps
  • Redundancy with a second provider
  • Professional router with built-in firewall
  • Managed switch with at least 48 ports

Pool configuration:

Using a proxy for Bitcoin mining can improve stability and reduce rejections.

Thermal management and energy efficiency

Insulation and sealing

Good insulation reduces cooling costs:

Recommended materials:

  • Thermal insulation with a minimum R-value of 6
  • Continuous vapour barrier
  • Insulated doors with an entrance vestibule
  • High-performance double-glazed windows

Heat recovery

The heat produced can be utilised:

Possible applications:

  • Heating of agricultural greenhouses
  • Biomass drying
  • District heating via heat exchangers
  • Domestic hot water production

A farm comprising 100 ASIC units produces ~300 kW of thermal energy, equivalent to heating 15 homes.

Regulatory and administrative aspects

Required authorisations

Mandatory procedures:

  • Planning permission if the area exceeds 20 m²
  • ICPE operating declaration if output >1 MW
  • Consuel certification for the electrical installation
  • Connection agreement with Enedis/ELD

Environmental compliance

2026 regulations:

  • Carbon declaration for installations >500 kW
  • Compliance with noise limits (35 dB at night)
  • E-waste management plan
  • Impact assessment if capacity exceeds 2 MW

Authorisation processing times can be up to 12 months. Plan for these procedures from the design stage onwards.

Financial analysis and profitability

Initial investment

Typical budget for 100 ASICs:

Item Estimated cost
ASICs (100 units) €800,000
Electrical infrastructure €120,000
Building/fit-out €180,000
Cooling system €60,000
Ancillary equipment €40,000
Total €1,200,000

Profitability calculation

Estimated monthly revenue (Bitcoin at €59,000):

  • Total hashrate: 23,400 TH/s
  • BTC output: ~38 BTC/year
  • Gross revenue: ~€190,000 per year

Operating costs:

  • Electricity (€0.08/kWh): ~€161,280 per year
  • Maintenance/spare parts: ~€24,000/year
  • Insurance/fees: ~€12,000/year

Estimated ROI: 3.2 years (excluding changes in market conditions and BTC prices)

Using tools such as those available in our Minent shop can optimise this profitability.

Monitoring and preventive maintenance

Monitoring system

Professional monitoring is essential:

Metrics monitored:

  • Temperature of each ASIC
  • Real-time power consumption
  • Hashrate and rejection rate
  • Network and pool status

Automatic alerts:

  • SMS/email in the event of a failure
  • Overheating notifications
  • Performance drop alerts

Preventive maintenance

Monthly schedule:

  • Fan cleaning (week 1)
  • Checking electrical connections (week 2)
  • Testing of safety systems (week 3)
  • Performance analysis (week 4)

Spare parts stock:

  • Spare fans (10 per cent of the fleet)
  • Control boards (5 per cent of the fleet)
  • Power supplies (3 per cent of the fleet)
  • Hashboards (as per manufacturer’s warranty)

Conclusion

Setting up a Bitcoin mining farm in 2026 requires a rigorous, professional approach. Electrical infrastructure, cooling and operational management are the cornerstones of profitability. With careful planning and an initial investment of around €12,000 per ASIC (all-inclusive), a well-designed farm can generate an attractive ROI despite intensifying competition.

The key to success lies in continuous optimisation and adapting to technological developments. To maximise your chances of success, create an account and benefit from professional management and monitoring tools tailored to modern mining farms.

Back to blog